187 Job openings found

1 Opening(s)
20.0 Year(s) To 25.0 Year(s)
Not Disclosed by Recruiter
Supervision Received Receives technical and operational supervision from Chief Construction Engineer or India Office Manager of Construction or designer. Supervision Exercised Provides technical and administrative direction to subordinate construction engineers if assigned. Leads construction management teams at jobsites on PMC capacity. Contacts Interface with the engineering design functional group, procurement and contracts, project ...
1 Opening(s)
1.0 Year(s) To 6.0 Year(s)
2.00 LPA TO 5.00 LPA
The missions and responsibilities of the CAD Executive_Engineering are : - Preparation of Preliminary and detailed solar PV layouts for ground Mounted Solar PV & other various supported Electrical equipment’s. - Preparation of Array layout, stringing layout, cable routing and trench layout, road layout. - Preparation of Electrical Layout for ICR, MCR, substation, street ...
2 Opening(s)
12.0 Year(s) To 20.0 Year(s)
10.00 LPA TO 40.00 LPA
Duties Performed:• Should be well acquainted with planning Tools & Scheduling packages Primavera P6 and SAP for Major overhaul projects.• Monitors and coordinates progress during the work execution and using computer facilities available (Primavera Planning System & SAP Maintenance System).• Assist Planning Engineers in preparation of work packages for Major ...
5 Opening(s)
10.0 Year(s) To 20.0 Year(s)
Not Disclosed by Recruiter
Position Summary: Supports cost estimating, analysis, and control activities and schedule development, maintenance, reporting, and monitoring activities, as directed. Qualifications and Skills: Basic Qualifications Experience in performing, monitoring, and reviewing planning and scheduling functions, including schedule development, control, and analysis, and cost engineering functions, including cost estimating, cost control, and cost analysis, in the ...
1 Opening(s)
3.0 Year(s) To 12.0 Year(s)
Not Disclosed by Recruiter
A fully integrated provider of technology, engineering and construction solutions to the energy industry. For more than a century, customers have trusted McDermott to design and build end-to-end infrastructure and technology solutions—from the wellhead to the storage tank—to transport and transform oil and gas into the products the world needs today.     Location      : Gurgaon Experience  ...
10 Opening(s)
6.0 Year(s) To 20.0 Year(s)
Not Disclosed by Recruiter
Electrical  Engineering (Physical  design) Knowledge in Electrical physical design like conceptualization and preparation of Air Insulated Switchyard, Gas Insulated substation, switchgear room layout, Control building layout, transformer yard layout, overall raceway layout, building raceway layouts, earthing layouts, Lightning layouts, lighting layouts, providing interdisciplinary inputs, interference resolution. Experience of working in 2D ...
15 Opening(s)
15.0 Year(s) To 25.0 Year(s)
30.00 LPA TO 60.00 LPA
The candidate should be proficient in use of International / National codes and standard.• Hands-on experience in vendor drawings, 3D model, isometrics and piping GADs   Conversant with 3D environment (PDS / SP3D / PDMS)• Conversant with 2D environment - Micro-station / AutoCAD   Modelling of piping and equipment in 3D environment (PDS / ...
1 Opening(s)
15.0 Year(s) To 25.0 Year(s)
Not Disclosed by Recruiter
Review of procedures and basis for the job. • Ensure that all work performed complies fully with all applicable codes, regulations etc., as well as company design standards & client requirements or in other words, design control.• Procedure and basis for the project.• Procedures for interface control with other departments.• ...
1 Opening(s)
15.0 Year(s) To 22.0 Year(s)
35.00 LPA TO 40.00 LPA
Purpose of the Job: Set up and animate the Integrated Quality Management System in accordance with company policy. Management of complete QA/QC of all equipment from suppliers and field quality on site and ensure project construction as per the Quality standards and requirement.   Reporting lines QA/QC Manager reports to Head-Projects/Construction.   Key Accountabilities Implementation of ...
2 Opening(s)
7.0 Year(s) To 10.0 Year(s)
Not Disclosed by Recruiter
Purpose of the Job:Reporting linesKey AccountabilitiesProvide timely and accurate project performance on site and status reporting.Enforce compliance with all Federal, State and Local codes, regulations and requirements;Accountable for the operational implementation of Quality requirements (setup and enforcement of QAP, NCR management) as well as enforcement of the Project Quality Control ...

Drop Your CV

We will consider your Profile for future Jobs

Submit Profile